浅谈如何提高大型路桥项目施工与机械化设备的生产率

  

(陕西咸阳公路局礼泉公路段,陕西 礼泉  713200

  从新、旧型路桥施工机械的交合使用,减耗高能使用的方式,路桥的生产率提高要依靠的内外条件,以及有效利用完备的路桥机械设备、物资和人工四个方面,对大型项目路桥施工与机械化成套设备的拥有量之间的关系以及如何提高路桥的生产率做出了分析,以期提高大型项目的生产率和工程质量,缩短施工工期,减少施工企业成本,增加利润。

关键词路桥施工机械设备生产率大项目

中图分类号:U445          文献标识码:A

How to Improve the Construction and Mechanized

 Equipment Productivity for Large Road & Bridge Projects

LI Peng

XianYang Highway Bureau LiQuan Site ShaanXiLiQuanShaanxi 713200China

AbstractFrom the four asphalts such as intercourse using of new/old road & bridge construction machineryreducing cost for the way of high energy consumptionthe internal andexternal conditions for the productivity of road & bridge and the effective utilization of road & bridge machineryequipmentmaterials and artificialthe paper analysed the relationship between large road & bridge construction project and ownership for mechanizationalso analysed how to increase the productivity of road & bridge.In order to enhance the productivity of a large project and project qualityshorten the construction periodreduce construction cost and increase profits.

Key wordsroad&bridge constructionmachinery&equipmentproductivitylarge project